Major aquaculture projects
Major rollout of Fortress Sea Pens – Huon Aquaculture
MPW was contracted to build over 100 cages ranging from 100m to 240m from the start of 2014 to the end of 2015 using the new Huon design Fortress Pen. Within this project, MPW welded in excess of 150,000m of pipe.
Tassal Hatchery R1
In 2009 MPW was contracted to fabricate and weld a variety of HDPE pipe and fittings for this new hatchery, which involved up to 6 staff onsite for around 14 months.
Tassal Hatchery R2
2015/16 MPW was contracted to supply pipe, fittings, fabrication, welding and installation of a large quantity of HDPE materials for this new hatchery worth over $2.0 million.
Tassal Sea Pens
MPW has built several Sea Pens for Tassal using MPW’s own design of stanchion.
Marine Produce Australia – Polar Circles Broome
MPW has constructed numerous 80 metre circumference sea pens for MPA. Twin flotation collars and all materials supplied by MPW including MPW’s own design stanchions.
Production plant – Scotland
MPW manufactured areas of production plant including processing tables, chutes and pipework.